Proth Jean-Marie
 Address : 22 rue du Colombier, 57420 Pouilly FRANCE  
 e-mail   : proth.jm@wanadoo.fr
 phone   : 33 (0)3 87 52 62 02
    PUBLICATIONS  (Short extract)

 Jean-Marie PROTH authored/coauthored 133 referred journal articles in EJOR, Large Scale Systems, Applied Stochastic Models and Data Analysis, Control and Cybernetics, IEEE Transaction on Automatic Control, International Journal of Production Research, Operations Research, IEEE Transactions on Robotics and Automation, among others. A short extract of these papers is given below. In addition, he has published 180 scientific papers in conference proceedings and 85 research reports at the European Institute for Advanced Studies in Management (Brussels) and the National Institute for Research in Computer Science and Control (INRIA), Rocquencourt, France (for more information, click on : http://hal.inria.fr/aut/Jean-Marie.Proth/ , then select "Recherche simple" from "Rechercher" and type "Jean-Marie Proth").

 
"Gestion des stocks avec coûts concaves", RAIRO Automatic Systems Analysis and Control, vol.15, n° 3, pp. 201.220, 1981, co-signatory: A. BENSOUSSAN.
 
"Sur l'effet des stocks tampons dans une fabrication en ligne", Revue Belge de Statistiques, d'Informatique et de R. O, vol. 24, n° 2, 1984, co-signatory: P. COILLARD.
 
"Inventory planning in a deterministic environment: concave cost set-up", Large Scale Systems, n°6, pp. 117-184, co-signatory: A. BENSOUSSAN.
 
"The general multi-products dynamic lot size model with individual inventory costs and joint production costs", Engineering Costs and Production Economics, vol. 9, 1985, pp. 15-21, co-signatory: V.I. LEOPOULOS.
 
"A new cross-decomposition algorithm: the GPM. Comparison with the bond energy method", Control and Cybernetics, vol. 15, n° 2, pp. 155-165, 1986, co-signatory: H. GARCIA.
 
"Performance evaluation of job-shop systems using timed event graphs", IEEE Transactions on Automatic Control, vol. 34, n° 1, 1989, co-signatory: H.P. HILLION.
 
"Real-time part allocation in FMS under finite storage capacity", International Journal of Computer Applications in Technology, vol. 2, n° 1, pp. 38-43, co-signatory: H. HILLION.
 
"Existence of forecast horizon in undiscounted discrete-time lot size models", Operations Research, vol. 38, N° 5, 884-892, 1990, co-signatories: S. CHAND and S.P. SETHI.
 
"Manufacturing cells and part families: generalization of the GP Method", Information and Decision Technologies, vol. 17, n° 1, pp. 51-61, 1991, co-signatories: G. HARHALAKIS and J. HILGER
 
"A planning horizon algorithm for deterministic inventory management with piecewise linear concave costs", Naval Research Logistics, vol. 38, n° 5, pp. 729-742, 1991, co-signatories: A. BENSOUSSAN and M. QUEYRANNE.
 
"Optimization of invariant criteria for event graphs", IEEE Transactions on Automatic Control, vol. 37, n° 5, pp. 547-555, 1992, co-signatories: S. LAFTIT and X. XIE.
 
"Heuristic procedures for minimizing makespan and the number of required pallets", European Journal of Operational Research, vol. 86, n° 3, pp. 491-502, 1995, co-signatories: C. CHU and S.P. SETHI.
 
"Single machine scheduling with chain structured constraints and windows on separation times", IEEE Transactions on Robotics and Automation, vol. 12, n° 6, 1996, co-signatory: C. CHU.
 
"Cyclic scheduling of a hoist with time window constraints", IEEE Transactions on Robotics and Automation, vol. 14, n° 1, 144-152, 1998, co-signatories: H. CHEN, C. CHU.
 
"An improvement of the lagrangian relaxation approach for job shop scheduling: A dynamic programming method", IEEE Transactions on Robotics and Automation, 14, 1998, 786 - 795, co-signatories: H. CHEN, C. CHU. Award: Best paper published in IEEE Transactions on Robotics and Automation for 1998.
 
"Marking optimization of stochastic timed event graphs using IPA", Discrete Event Dynamic Systems: Theory and Applications, n° 6, 221-239, 1996, co-signatories: N. SAUER, Y. WARDI and X. XIE.
 
"Heuristic approaches for n/m/F/SCi scheduling problems", European Journal of Operational Research, vol. 96, 636-644, 1997, co-signatories: C. CHU and C. WANG.
 
"Improving job-shops schedules through critical pairwise exchanges", International Journal of Production Research, vol.36, n°3, 683 - 694, 1998, co-signatories: C. CHU, C. WANG.
 
"The Cutting Stock Problem with Mixed Objectives: Two Heuristics Based on Dynamic Programming", European Journal of Operational Research  (EJOR), vol. 114, n°2, 1999, 395-402,co -signatories: J. ANTONIO, P. CHAUVET and Ch. CHU.
 
"On-line Part Scheduling in a Surface Treatment System", European Journal of Operational Research, vol. 120/2,2000, co-signatories: F. CHAUVET, E. LEVNER.
 
"Scheduling No-Wait Production with Time Windows and Flexible Processing Times", IEEE Transactions on Robotics and Automation, vol. 17, n° 1, 60-69, 2001,co-signatories: F. CHAUVET and Y. WARDI.
 
"Optimization of Cyclic Production Systems: A Heuristic Approach", IEEE Transactions on Robotics and Automation, Vol. 19, n° 1, 2003, co-signatories: F. CHAUVET and J. W. HERRMANN.
 
"On-line Scheduling in Supply Chain Environment", Optimal Control and Partial Differential Equations, Eds. J.-L. MENALDI et al., IOS Press, 539-548,2001.
 
"Due date assignment and scheduling: SLK, TWK and other due date assignment models", Production Planning and Control, vol. 13, n°2, 117-132, 2002, co-signatory: V. GORDON, Ch. CHU.
 
"Multifunction radar: Task scheduling", Journal of mathematical modeling and algorithms, 1, 105-116, 2002, co-signatory: C. DURON
 
The concave cost supply problem”, European Journal of Operations Research, 2003,Vol 148, n°2, 374 – 383,Co-signatory: S. S. CHAUHAN.
 
The 0-1 outcomes feature selection problem : a Chi2 approach”. Journal of Intelligent Manufacturing, vol. 15, n° 3, 2003, co-signatory: C. DURON.
 
A systems-based approach for city logistics decision making”, Journal of Advances in Management Research, 3(II), 7-17, co-signatory: AWASHI A., 2006.
 
Optimisation of multi-position machines and transfer lines“, European Journal of Operational Research, 185(3), 1375-1389, 2008, co-signatories: A. Dolgui, N. Guschinsky and G. Levin.
 
A continuous model for supply planning of assembly systems with stochastic component procurement times”, International Journal of Production Economics, 120(2), 411-417, 2009, co-signatories: A. Dolgui, S.S. Chauhan.
 
Minimizing the number of machines for minimum length schedules”, European Journal of Operational Research, 199, 702-705, 2009, co-signatories: G. Finke, P. Lemaire, M. Queyranne.
 
The one machine scheduling problem: Insertion of a job under the real time constraint”, European Journal of Operational Research, 199, 695-701, 2009, co-signatories: C. Duron, M.A. Ould Louly.
 
"Pricing strategies and models", Annual Review in Control, 34(1), April 2010, co-signatory: A Dolgui
 
 

 

visite(s)